Abstract
Although gangform has good workability due to the integration of outer wall forms and working platforms, 22 workers were died from 21 gangform related accidents during 2012 to 2016. Quantitative risk assessment is required for evident based prevention measure selection. In this study, based on 52 accident data from 2004 to the first half of 2019, FTA is conducted for probabilities of direct causes and their contribution to accidents. Three stages are considered; gangform installation, dismantling and lifting, and using. The effectiveness of countermeasures is evaluated through minimum cut set, RAW and RRW. Complete assembly of gangform on the ground level, detailed planning, and fall prevention device are suggested as prevention measures for installation, dismantling and lifting, and using stages, respectively.
| Translated title of the contribution | Quantitative Risk Assessment based on Fault Tree Analysis for Gangform Accident |
|---|---|
| Original language | Korean |
| Pages (from-to) | 40-47 |
| Number of pages | 8 |
| Journal | 한국안전학회지 |
| Volume | 35 |
| Issue number | 4 |
| DOIs | |
| State | Published - 2020 |