Abstract
Productivity is also a very important indicator in the construction industry as it can measure economic growth and the efficiency of each related production activity, either at the industrial level or at the corporate level. Technical factors indeed have a great impact on productivity, but in order to improve productivity in the actual construction industry, various productivity factors must be analyzed first, and the efforts to improve productivity at the project level are more important than the efforts to improve productivity at the construction industry level, which are addressed from a macro perspective. This study was designed to provide basic data for efficient productivity management activities of the project by selecting priority management factors through the causal analysis of the factors and the elicitation of the productivity degradation factors at the construction site to improve the quality of the construction industry.
| Translated title of the contribution | Causal Relationship Analysis of the Factors Lowering Productivity in Construction Job Site |
|---|---|
| Original language | Korean |
| Pages (from-to) | 99-110 |
| Number of pages | 12 |
| Journal | 한국건설관리학회 논문집 |
| Volume | 21 |
| Issue number | 1 |
| DOIs | |
| State | Published - Jan 2020 |