공동주택 이중관 공법의 현안 분석 및 개선 연구

Translated title of the contribution: A Study on the Status and Improvement of Double Pipe System in Apartment Buildings

Research output: Contribution to journalArticlepeer-review

Abstract

Double pipe system in which PB pipe is inserted in CD pipe buried in the concrete slab is widely used for cold and hot water supplies in apartment housings. The system, however becomes complicated and the overlaying pipes in the concrete slab weaken the compressive strength of the slab. Also, insufficient insulation increases energy loss. In this work, the problems of the double pipe system are studied and plans A, B, and C are suggested for improvement. In terms of compressive strength of the concrete slab, plan A(total pipe length 73 m) was the weakest and plan B(2 m) was the strongest. Energy loss of plan A was the largest with 558.9 W and plan B was the lowest with 220.7 W. However, considering the combined effect of strength and heat loss, plan C becomes the best choice, which retains the advantage of the double pipe system.
Translated title of the contributionA Study on the Status and Improvement of Double Pipe System in Apartment Buildings
Original languageKorean
Pages (from-to)37-42
Number of pages6
Journal설비공학 논문집
Volume25
Issue number1
DOIs
StatePublished - Jan 2013

Fingerprint

Dive into the research topics of 'A Study on the Status and Improvement of Double Pipe System in Apartment Buildings'. Together they form a unique fingerprint.

Cite this