Abstract
This study is a proactive research effort to develop a solution that automatically detects discrepancies between P&ID and BIM for improving construction integrity in high-tech facilities such as semiconductor FAB. First, we analyzed and categorized discrepancy cases reported during the AFC (Approved for Construction) phase. We then proposed the necessary modeling guideline and details for P&ID and MEP BIM, and finally, to align the model specification, model resolution and system context between P&ID and MEP BIM, we proposed logic and conditions of P&ID2NET and BIM2NET model transformation suitable for domestic high-tech construction sites.
| Translated title of the contribution | Development of Model Transformation Logic for Discrepancy Detection between P&ID and BIM of Process MEP System for Improved Construction Integrity |
|---|---|
| Original language | Korean |
| Pages (from-to) | 371-378 |
| Number of pages | 8 |
| Journal | Journal of the Architectural Institute of Korea |
| Volume | 42 |
| Issue number | 2 |
| DOIs | |
| State | Published - Feb 2026 |
Keywords
- Approved for Construction
- Building Information Modeling
- Level of Development
- Mechanical Electrical and Plumbing
- Model Transformation
- Piping and Instrumentation Diagram
Fingerprint
Dive into the research topics of 'Development of Model Transformation Logic for Discrepancy Detection between P&ID and BIM of Process MEP System for Improved Construction Integrity'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver