선지보 터널공법을 적용한 파쇄암반 터널의 굴진장증가에 관한 연구

Translated title of the contribution: A study on the increasing advance length by pre-supported tunnelling method in heavily fractured rock condition

Research output: Contribution to journalArticlepeer-review

Abstract

Safety techniques for the excavation of large-span tunnel such as multi-face excavation and minimizing advance length per a excavation round are widely used in Korean empirical tunnelling experiences. The pre-supported tunnelling method which is the technique of strengthening the ground ahead of the tunnel working face has been used recently for improving safety and efficiency of those old empirical tunnelling. This paper discusses the approach using analytical method and numerical analysis for the practical application of the increased advance length by pre-supported tunnelling method to a large-span tunnel site and the result of the application that is verified from the site monitoring data which were recorded through the improved excavation cycle of the increased advance length per a excavation round.
Translated title of the contributionA study on the increasing advance length by pre-supported tunnelling method in heavily fractured rock condition
Original languageKorean
Pages (from-to)111-123
Number of pages13
Journal한국도시철도학회논문집
Volume6
Issue number2
DOIs
StatePublished - Jun 2018

Fingerprint

Dive into the research topics of 'A study on the increasing advance length by pre-supported tunnelling method in heavily fractured rock condition'. Together they form a unique fingerprint.

Cite this