설계변경으로 인한 기계설비 배관공사 적산작업의 효율화 방안

Translated title of the contribution: Efficient Plan of Mechanical Facility Piping Work Cost Estimation due to Design Changes

Research output: Contribution to journalArticlepeer-review

Abstract

At construction sites, design changes occur frequently for various reasons. Design changes during construction need to be carried out with a fast-track method because it must be performed prior to construction. Among various design change works of construction, the item that requires the most work time is cost estimation. Among various fields, mechanical facility is the one with the highest number of items. In mechanical facility field, the piping work has the highest number of items. This work intends to present an efficient plan for cost estimation of piping work due to design changes. Prior research, domestic standards, and international standards were investigated. Cost estimation methods of mechanical piping work by existing drawing and BIM were compared and analyzed. When calculating the quantity by BIM, a lot of time is required for converting the existing 2D drawing to BIM. On the other hand, direct calculation method required relatively less time because there were many similar parts for pipe connection. There was a difference of about 8% in the price depending on whether the piping premium was applied and whether piping parts were included in the piping length.
Translated title of the contributionEfficient Plan of Mechanical Facility Piping Work Cost Estimation due to Design Changes
Original languageKorean
Pages (from-to)33-341
Number of pages10
Journal설비공학 논문집
Volume33
Issue number7
DOIs
StatePublished - Jul 2021

Fingerprint

Dive into the research topics of 'Efficient Plan of Mechanical Facility Piping Work Cost Estimation due to Design Changes'. Together they form a unique fingerprint.

Cite this