세장판 복부를 갖는 H형 보의 파형 CFRP 패널을 이용한 최적 전단보강

Translated title of the contribution: Nonlinear Seismic Performance Evaluation of an Operating TBM(Tunnel Boring Machine) Tunnel

Research output: Contribution to journalArticlepeer-review

Abstract

Recently, the TBM tunnel construction method has been in the spotlight as tunnel excavation under urban areas such as the Metropolitan Rapid Transit (GTX) has been actively carried out. Although the construction cost of the TBM tunnel is high, it is relatively free from noise and vibration compared to the NATM tunnel method, so it is well known to be a suitable construction method for application to the lower part of urban areas. In particular, when the stratum passes through the shallow section, it can have a great impact on existing upper structures and obstacles, so accurate numerical analysis considering various variables is required when designing the TBM tunnel. Unlike other tunnel construction methods, TBM tunnels build linings by assembling factory-made segments. Unlike NATM tunnels, segment lining has connections between segments, so how to the connection status between segments is reflected can have a significant impact on securing the reliability of analysis results. Therefore, in this paper, a segment joint model(Janssen Model) was applied to the lining for seismic analysis of the TBM tunnel, and the tunnel's behavioral characteristics were analyzed after numerical analysis using nonlinear models according to urban railway seismic design standards.
Translated title of the contributionNonlinear Seismic Performance Evaluation of an Operating TBM(Tunnel Boring Machine) Tunnel
Original languageKorean
Pages (from-to)1-9
Number of pages9
Journal한국구조물진단유지관리공학회 논문집
Volume28
Issue number5
DOIs
StatePublished - 2024

Fingerprint

Dive into the research topics of 'Nonlinear Seismic Performance Evaluation of an Operating TBM(Tunnel Boring Machine) Tunnel'. Together they form a unique fingerprint.

Cite this