New Opening of Suseo-Pyeongteak High Speed Railway (HSR) will be a new leap in the Korean railway history.
However if this section of HSR line around Seoul Metropolitan Area opens, the confluence of new HSR and existing HSR line in Pyeongteak-Osong section will cause a bottle neck problem. In other words, the opening of Suseo-Pyeongteak HSR line will make the capacity of track reach the limit and the section of railroad between Pyeongteak and Osong will be saturated. This will also make such troubles as restricting the number of train which stops at Cheonan-Asan station. In this study, based on the train assignment theory of TVM430 signal system, the methods of calculating headway and number of train are reviewed and the plan for application of optimal operation pattern during peak hour between Pyeongteak-Osong section is also suggested. To remove the bottle neck problem in this HSR section, 3 alternatives are suggested and the expected effects and problems of each alternative are also analyzed. The results show that the troubles caused by excess of track capacity can be removed without any additional cost if the minimum headway in operating system for HSR is adopted in this section. In the future, if these alternatives are considered to the long-term plan for operating train and signal systems,this will improve the efficiency of train operation, which can remove the bottle neck in the HSR line.
However if this section of HSR line around Seoul Metropolitan Area opens, the confluence of new HSR and existing HSR line in Pyeongteak-Osong section will cause a bottle neck problem. In other words, the opening of Suseo-Pyeongteak HSR line will make the capacity of track reach the limit and the section of railroad between Pyeongteak and Osong will be saturated. This will also make such troubles as restricting the number of train which stops at Cheonan-Asan station. In this study, based on the train assignment theory of TVM430 signal system, the methods of calculating headway and number of train are reviewed and the plan for application of optimal operation pattern during peak hour between Pyeongteak-Osong section is also suggested. To remove the bottle neck problem in this HSR section, 3 alternatives are suggested and the expected effects and problems of each alternative are also analyzed. The results show that the troubles caused by excess of track capacity can be removed without any additional cost if the minimum headway in operating system for HSR is adopted in this section. In the future, if these alternatives are considered to the long-term plan for operating train and signal systems,this will improve the efficiency of train operation, which can remove the bottle neck in the HSR line.
| Translated title of the contribution | Development of Optimal Train Operation System in Bottle-neck Section According to the Opening of High Speed Railway in Seoul Metropolitan Area |
|---|---|
| Original language | Korean |
| Pages (from-to) | 631-637 |
| Number of pages | 7 |
| Journal | 한국철도학회논문집 |
| Volume | 15 |
| Issue number | 6 |
| DOIs | |
| State | Published - Dec 2012 |