Abstract
The e-government project management consignment system to allow the public PMO has been introduced toresolve the quality management issue and the business risk, pointed out by the reorganized Software IndustryPromotion Act. The additional regulation improvements are demanded because the public PMO system cannot settledown due to the different opinions among related parties: owner, operator and PMO. Therefore, to make balancedregulation improvements, the in-depth studies are necessary to analyze the fundamental causes of the disagreementbetween the related parties. This study analyses the each related party’s cognitive structure to perform public PMOsuccessfully and the fundamental reasons that cause the different opinions by applying the cognitive psychologicalMeans-end chain theory, the laddering technique and the HVM, Hierarchical Value Map. In addition, this studyanalyses the regulations required for the related parties to obtain the expected benefits.
Translated title of the contribution | Simulation for Benefit-cost Analysis of Smart Grid Hub Project |
---|---|
Original language | Korean |
Pages (from-to) | 137-151 |
Number of pages | 15 |
Journal | 한국시뮬레이션학회 논문지 |
Volume | 24 |
Issue number | 4 |
DOIs | |
State | Published - Dec 2015 |