재정투자평가사업에 대한 예비타당성조사 기반의 사후평가관리시스템 도입 방안

Translated title of the contribution: Introduction of a Post Evaluation Management System based on the Preliminary Feasibility Study of Publicly Financed Projects

Ji Pyo Kim

Research output: Contribution to journalArticlepeer-review

Abstract

Since the preliminary feasible study on public projects was introduced in 1999, it has played a pivotal role in scrutinizing projects and justifying their purpose. However, it is also true that no systematic way exists to monitor the project process and evaluate its outcomes. This study suggests that it is necessary to develop a post evaluation management system for the publicly financed projects which have gone through the preliminary feasibility study. Using the PLM methodology, a post evaluation model was designed that incorporates the key factors and indices that need to be considered in the evaluation process. The post evaluation management system was configured and the implementation procedure of the system was specified along with the operation plan. The proposed system is to check the progress and results of projects, and to provide essential information to enhance the quality of projects and support stakeholders’ decision making regarding the project.
Translated title of the contributionIntroduction of a Post Evaluation Management System based on the Preliminary Feasibility Study of Publicly Financed Projects
Original languageKorean
Pages (from-to)226-236
Number of pages11
Journal대한산업공학회지
Volume44
Issue number3
DOIs
StatePublished - Jun 2018

Fingerprint

Dive into the research topics of 'Introduction of a Post Evaluation Management System based on the Preliminary Feasibility Study of Publicly Financed Projects'. Together they form a unique fingerprint.

Cite this