Abstract
This study aimed to provide basic data for permeable pavement application upon design and installation stages by analyzing the effect of permeable pavement used on the facility area rather than using non-point pollutants treatment facility upon development business in accordance with recent trend. To perform this study, the area of development target was separately applied as impermeable and permeable developments so as to compare and analyze the economics of cut pollution load and installation construction cost. Consequently, the processing amount and cut load of non-point pollutant sources are influenced much by permeable and impermeable developments, and it was turned out to be better to develop target river area as permeable area rather than installing non-point pollutants treatment facility of equipment type or natural type upon development to yield smaller discharge load. If we can prepare a countermeasure regulating impermeable area ratio to certain level to manage non-point pollutants upon development based on this result, we can minimize the source of pollution caused by the development.
| Translated title of the contribution | Reduced Loads Characteristics Comparison Between Permeable Pavement and Non-point Pollutants Treatment Facility |
|---|---|
| Original language | Korean |
| Pages (from-to) | 193-198 |
| Number of pages | 6 |
| Journal | 한국방재학회논문집 |
| Volume | 11 |
| Issue number | 2 |
| DOIs | |
| State | Published - Apr 2011 |