Abstract
This paper describes peak shaving algorithms as long-term cycle scheduling in the power management system (PMS) for MW-scale battery energy storage systems (BESS). The purpose of PMS is basically to manage the input and output power from battery modules placed in the systems. Assuming that an one-day ahead load curve is provided, off-line peak shaving algorithms can be employed, but applying the results of the off-line algorithm may result in the difference in the real-time performance because there is uncertainty in the provided load curve. This paper adopts fuzzy based LP (linear programming) algorithms for describing the peak shaving algorithm in PMS and discusses a solution technique and real-time operation strategies using the solution.
| Translated title of the contribution | Fuzzy LP Based Power Network Peak Shaving Algorithm |
|---|---|
| Original language | Korean |
| Pages (from-to) | 754-760 |
| Number of pages | 7 |
| Journal | 한국지능시스템학회 논문지 |
| Volume | 22 |
| Issue number | 6 |
| DOIs | |
| State | Published - Dec 2012 |