퍼지 LP 기반 전력망 Peak Shaving 알고리즘

Translated title of the contribution: Fuzzy LP Based Power Network Peak Shaving Algorithm

Research output: Contribution to journalArticlepeer-review

Abstract

This paper describes peak shaving algorithms as long-term cycle scheduling in the power management system (PMS) for MW-scale battery energy storage systems (BESS). The purpose of PMS is basically to manage the input and output power from battery modules placed in the systems. Assuming that an one-day ahead load curve is provided, off-line peak shaving algorithms can be employed, but applying the results of the off-line algorithm may result in the difference in the real-time performance because there is uncertainty in the provided load curve. This paper adopts fuzzy based LP (linear programming) algorithms for describing the peak shaving algorithm in PMS and discusses a solution technique and real-time operation strategies using the solution.
Translated title of the contributionFuzzy LP Based Power Network Peak Shaving Algorithm
Original languageKorean
Pages (from-to)754-760
Number of pages7
Journal한국지능시스템학회 논문지
Volume22
Issue number6
DOIs
StatePublished - Dec 2012

Fingerprint

Dive into the research topics of 'Fuzzy LP Based Power Network Peak Shaving Algorithm'. Together they form a unique fingerprint.

Cite this