폴리우레아 도막방수재의 이음부 적정 시공안 제안을 위한 성능 분석

Translated title of the contribution: Performance Analysis for Proposing Proper Construction Method for Joints of Polyurea Waterproofing Membrane Coating

Research output: Contribution to journalArticlepeer-review

Abstract

In this study, an evaluation was conducted for a total of 16 conditions to suggest an appropriate construction method for the construction joint of polyurea waterproofing membrane coating. It was analyzed that the longer the construction time difference, the higher the rate of water leaks through joints, and it was confirmed that water leaks could be prevented through primer construction. In addition, since the surface of polyurea exposed outdoors for a long period of time is deteriorated and weakened, it was analyzed that polishing the area increases surface damage and affects the formation of the interface. During maintenance construction, it would be desirable to apply a primer before construction, and it is believed that using the same urea-based material will ensure waterproofing stability.
Translated title of the contributionPerformance Analysis for Proposing Proper Construction Method for Joints of Polyurea Waterproofing Membrane Coating
Original languageKorean
Pages (from-to)77-86
Number of pages10
Journal한국건축시공학회지
Volume24
Issue number1
DOIs
StatePublished - 2024