2-arch 터널 정거장 굴착 시 평면변형률 조건에서 군말뚝의 이격거리에 따른 지반거동 분석

Translated title of the contribution: Investigation of ground behaviour between plane-strain grouped pile and 2-arch tunnel station excavation

Research output: Contribution to journalArticlepeer-review

Abstract

Special tunnel design and construction methods have been suggested due to developments of subway and tunnel. Collapse accidents of tunnel bring enormous damage. So, observation and analysis for the safety of tunnelling and behaviour of surrounding ground are important. But, it is not economical to implement the field test in every time. Therefore, this study has measured ground behaviour due to excavation of 2-arch tunnel station according to offset between grouped pile and tunnel by laboratory model test. For the model test, trapdoor device was adopted. Tunnelling is simulated by volume loss of 2-arch tunnel. Ground displacements are observed by close range photogrammetric method and image processing. In addition, these data are compared with numerical analysis.
Translated title of the contributionInvestigation of ground behaviour between plane-strain grouped pile and 2-arch tunnel station excavation
Original languageKorean
Pages (from-to)353-544
Number of pages10
Journal한국터널지하공간학회 논문집
Volume18
Issue number6
DOIs
StatePublished - Nov 2016

Fingerprint

Dive into the research topics of 'Investigation of ground behaviour between plane-strain grouped pile and 2-arch tunnel station excavation'. Together they form a unique fingerprint.

Cite this