2 Step 이상 운용 고객의 구내배전계통 지락보호시스템 구성 현황 및 문제점 검토

Translated title of the contribution: A Study on Trouble and Arrangement of the Ground-Fault Protection for 2 Step Voltage Distribution System of Premises

Research output: Contribution to journalArticlepeer-review

Abstract

Most accidents occurred in power receiving & transforming facility are ground fault. The quality of power supply is deteriorated since the ground fault is not detected promptly. This paper analyzes the problems about system-grounding type of 2 step power receiving & transforming facility, arrangement of protection relaying scheme and ground-fault protection system of ungrounded system. Then, this paper presents the arranging scheme of system-grounding type to improve power supply reliability.
Translated title of the contributionA Study on Trouble and Arrangement of the Ground-Fault Protection for 2 Step Voltage Distribution System of Premises
Original languageKorean
Pages (from-to)73-77
Number of pages5
Journal조명.전기설비학회논문지
Volume24
Issue number10
DOIs
StatePublished - Oct 2010

Fingerprint

Dive into the research topics of 'A Study on Trouble and Arrangement of the Ground-Fault Protection for 2 Step Voltage Distribution System of Premises'. Together they form a unique fingerprint.

Cite this