3차원 스캔을 이용한 터널계측의 경제성에 관한 연구

Translated title of the contribution: A Study of Economic Aspects on 3-D Scanning Measurement during Tunnel Construction

Research output: Contribution to journalArticlepeer-review

Abstract

D&B(Drill & Blast) method in tunnel construction requires accurate and rapid measurement of the ground movement, which is essential for feedback analysis. Case study and adaptability of IT technique for tunnel survey are discussed in this paper. The application of laserscannig and existing light wave instrument method in the field of tunnel construction were reported in several advanced country including Austria and Japan. Survey for the shoulder movements by IT survey method was conducted at a subway construction site and the results were compared to the conventional method. Also, the economic aspects of laserscannig method were analyzed using measured data which were categorized by expenses, frequency, interval and period in the field of construction. Therefore IT survey solution may contribute to execute more economic and safe construction
Translated title of the contributionA Study of Economic Aspects on 3-D Scanning Measurement during Tunnel Construction
Original languageKorean
Pages (from-to)77-81
Number of pages5
Journal한국방재학회논문집
Volume10
Issue number2
StatePublished - Apr 2010

Fingerprint

Dive into the research topics of 'A Study of Economic Aspects on 3-D Scanning Measurement during Tunnel Construction'. Together they form a unique fingerprint.

Cite this