TY - JOUR
T1 - A study on improvement of evaluation indicators of Korean urban railway operators
AU - Kim, Sujin
AU - Chung, Sungbong
N1 - Publisher Copyright:
© 2019 The Korean Society for Railway. All rights reserved.
PY - 2019
Y1 - 2019
N2 - Business evaluation indicators should reflect unique characteristics of the industry and involve fair and objective evaluation methods to encourage each company's business improvement; however, the current evaluation system for urban railway operators has been criticized for not satisfying these conditions. So, we will analyze problems of business evaluation of urban railway operators and suggest improvement measures. We will compare the Korean evaluation indicators with recognized international performance indicators to find problems in weightings, indicators setting, and evaluation methods, and will analyze the relationship between evaluation results for the most recent five years (2013-2017), as well as external elements, to verify if the results tend to be determined by external elements. Finally, we will suggest adding new indicators and changing evaluation methods to solve problems found. One limitation of this study is that it is not possible to conduct evaluation simulation based on the suggested indicators.
AB - Business evaluation indicators should reflect unique characteristics of the industry and involve fair and objective evaluation methods to encourage each company's business improvement; however, the current evaluation system for urban railway operators has been criticized for not satisfying these conditions. So, we will analyze problems of business evaluation of urban railway operators and suggest improvement measures. We will compare the Korean evaluation indicators with recognized international performance indicators to find problems in weightings, indicators setting, and evaluation methods, and will analyze the relationship between evaluation results for the most recent five years (2013-2017), as well as external elements, to verify if the results tend to be determined by external elements. Finally, we will suggest adding new indicators and changing evaluation methods to solve problems found. One limitation of this study is that it is not possible to conduct evaluation simulation based on the suggested indicators.
KW - Business evaluation
KW - Key performance indicators
KW - Metro operation
KW - Operation quality
KW - Urban railway
UR - http://www.scopus.com/inward/record.url?scp=85072683446&partnerID=8YFLogxK
U2 - 10.7782/JKSR.2019.22.8.649
DO - 10.7782/JKSR.2019.22.8.649
M3 - Article
AN - SCOPUS:85072683446
SN - 1738-6225
VL - 22
SP - 649
EP - 661
JO - Journal of the Korean Society for Railway
JF - Journal of the Korean Society for Railway
IS - 8
ER -