TY - JOUR
T1 - Analysis of runoff reduction performance of permeable pavement and rain barrel in Mokgam stream basin and determination of installation priorities
AU - Seung-Tak, Chae
AU - Eun-Sung, Chung
AU - Inhwan, Park
N1 - Publisher Copyright:
© 2023 Korea Water Resources Association. All rights reserved.
PY - 2023
Y1 - 2023
N2 - This study aimed to assess runoff reduction performance and determine installation priorities for Permeable Pavement (PP) and Rain Barrel (RB) within the Mokgam Stream basin. Optimal design parameters were determined to maximize the effectiveness of PP and RB in reducing runoff. Furthermore, the optimal parameters were incorporated to compare the runoff reduction performance of PP and RB. Analysis of the runoff curve at the basin outlet indicated that PP demonstrated superior performance in reducing runoff during the rising limb of the curve. At the same time, RB excelled within the falling limb. Comparisons of total runoff and peak runoff reduction by sub-catchment revealed that in larger sub-catchment areas, PP outperformed RB in runoff reduction. In contrast, RB exhibited higher performance in areas with a higher impervious ratio. Based on the evaluation of runoff reduction performance for PP and RB, installation priorities were determined within the Mokgam Stream basin. The results showed that PP and RB installations were prioritized for sub-catchments with larger areas and a higher impervious ratio. Furthermore, the correlation between the ranking of runoff reduction performance and sub-catchment characteristics showed a high correlation with both the impervious area ratio and sub-catchment geometrical properties in sub-watersheds exhibiting the top 25% runoff reduction performance. These results emphasize that when determining the priority for installing LID facilities in developed urban areas, it is necessary to consider not only the impervious area ratio but also the geometrical properties of the sub-catchment.
AB - This study aimed to assess runoff reduction performance and determine installation priorities for Permeable Pavement (PP) and Rain Barrel (RB) within the Mokgam Stream basin. Optimal design parameters were determined to maximize the effectiveness of PP and RB in reducing runoff. Furthermore, the optimal parameters were incorporated to compare the runoff reduction performance of PP and RB. Analysis of the runoff curve at the basin outlet indicated that PP demonstrated superior performance in reducing runoff during the rising limb of the curve. At the same time, RB excelled within the falling limb. Comparisons of total runoff and peak runoff reduction by sub-catchment revealed that in larger sub-catchment areas, PP outperformed RB in runoff reduction. In contrast, RB exhibited higher performance in areas with a higher impervious ratio. Based on the evaluation of runoff reduction performance for PP and RB, installation priorities were determined within the Mokgam Stream basin. The results showed that PP and RB installations were prioritized for sub-catchments with larger areas and a higher impervious ratio. Furthermore, the correlation between the ranking of runoff reduction performance and sub-catchment characteristics showed a high correlation with both the impervious area ratio and sub-catchment geometrical properties in sub-watersheds exhibiting the top 25% runoff reduction performance. These results emphasize that when determining the priority for installing LID facilities in developed urban areas, it is necessary to consider not only the impervious area ratio but also the geometrical properties of the sub-catchment.
KW - Installation priority
KW - Low Impact Development (LID)
KW - Permeable pavement
KW - Rain barrel
KW - Runoff reduction
KW - Urban flood
UR - http://www.scopus.com/inward/record.url?scp=85183190921&partnerID=8YFLogxK
U2 - 10.3741/JKWRA.2023.56.12.905
DO - 10.3741/JKWRA.2023.56.12.905
M3 - Article
AN - SCOPUS:85183190921
SN - 2799-8746
VL - 56
SP - 905
EP - 918
JO - Journal of Korea Water Resources Association
JF - Journal of Korea Water Resources Association
IS - 12
ER -