TY - JOUR
T1 - Comparison of Bio-P module and the modified Bio-P module in the step-feed biological nutrient removal process
AU - Gil, Kyungik
AU - Rho, Haeyeon
AU - Kim, Daeik
AU - Stenstrom, Michael K.
PY - 2012/2
Y1 - 2012/2
N2 - The Modified Bio-P module was evaluated in terms of the kinetic rate expression and engineering parameters, comparing the measured data of full-scale plant with simulated data. To simulate step-feed BNR (Biological Nutrient Removal), the ASM3 (Activated Sludge Model 3) with the EAWAG Bio-P Module (The Swiss Federal Institute for Environmental Science and Technology) and the ASM3+Modified Bio-P module were used. The RMSEs (root mean square error) of the T-N (total nitrogen) concentration of the effluent levels of measured and simulated examples were 2.29 for ASM3+Bio-P and 1.28 for ASM3+Modified Bio-P. In the case of T-P (total phosphorus), the RMSEs were 0.28 for ASM3+Bio-P and 0.25 for ASM3+Modified Bio-P. The annual removal rates for T-N were 0.77 for the measured, 0.69 for the Bio-P, and 0.74 for the Modified Bio-P samples, while the annual removal rates for T-P were 0.64 for the measured, 0.72 for the Bio-P, and 0.60 for the Modified Bio-P cases. With simulated data, the Modified Bio-P model was a better fit for the field data compared to Bio-P. The Modified Bio-P module reproduced the step-feed process more effectively than the Bio-P module.
AB - The Modified Bio-P module was evaluated in terms of the kinetic rate expression and engineering parameters, comparing the measured data of full-scale plant with simulated data. To simulate step-feed BNR (Biological Nutrient Removal), the ASM3 (Activated Sludge Model 3) with the EAWAG Bio-P Module (The Swiss Federal Institute for Environmental Science and Technology) and the ASM3+Modified Bio-P module were used. The RMSEs (root mean square error) of the T-N (total nitrogen) concentration of the effluent levels of measured and simulated examples were 2.29 for ASM3+Bio-P and 1.28 for ASM3+Modified Bio-P. In the case of T-P (total phosphorus), the RMSEs were 0.28 for ASM3+Bio-P and 0.25 for ASM3+Modified Bio-P. The annual removal rates for T-N were 0.77 for the measured, 0.69 for the Bio-P, and 0.74 for the Modified Bio-P samples, while the annual removal rates for T-P were 0.64 for the measured, 0.72 for the Bio-P, and 0.60 for the Modified Bio-P cases. With simulated data, the Modified Bio-P model was a better fit for the field data compared to Bio-P. The Modified Bio-P module reproduced the step-feed process more effectively than the Bio-P module.
KW - Activated sludge model 3 (ASM3)
KW - Bio-P
KW - Biological nutrient removal (BNR)
KW - Modeling
KW - Modified Bio-P
UR - https://www.scopus.com/pages/publications/84885390533
U2 - 10.1007/s12665-011-1203-9
DO - 10.1007/s12665-011-1203-9
M3 - Article
AN - SCOPUS:84885390533
SN - 1866-6280
VL - 65
SP - 929
EP - 936
JO - Environmental Earth Sciences
JF - Environmental Earth Sciences
IS - 3
ER -