Economic-statistical design of 2-of-2 and 2-of-3 runs rule scheme

Young Bok Kim, Jung Sik Hong, Chang Hoon Lie

Research output: Contribution to journalArticlepeer-review

16 Scopus citations

Abstract

In this paper, we investigate the economic-statistical design method for the 2-of-2 runs rule and the 2-of-3 runs rule. The Markov chain approach is used to obtain the average run length and the process cycle time. In addition, a simplified algorithm is presented to search the optimal setting of the design parameters. A numerical example and sensitivity analysis are also provided to compare the performances of the runs rules. The results show that the use of runs rule scheme can reduce operating cost comparing with the Shewhart control chart while maintaining a good statistical performance.

Original languageEnglish
Pages (from-to)215-228
Number of pages14
JournalQuality and Reliability Engineering International
Volume25
Issue number2
DOIs
StatePublished - Mar 2009

Keywords

  • Average run length
  • Average time to signal
  • Economic-statistical design
  • Markov chain approach
  • Runs rule

Fingerprint

Dive into the research topics of 'Economic-statistical design of 2-of-2 and 2-of-3 runs rule scheme'. Together they form a unique fingerprint.

Cite this