T1 - Expand, relocate, or underground? Social acceptance of upgrading wastewater treatment plants
AU - Huh, Sung Yoon
AU - Shin, Jungwoo
AU - Ryu, Jaena
N1 - Publisher Copyright:
© 2020, Springer-Verlag GmbH Germany, part of Springer Nature.
PY - 2020/12
Y1 - 2020/12
N2 - Securing a moderate level of social acceptance for obnoxious facilities, public facilities that have negative effects, such as odors, noise, or other disruptions, is critical to infrastructure plans. For wastewater treatment plant (WWTP), also obnoxious facilities, upgrading and expanding the capacity of existing WWTP, are more important than the construction of new plants, in some regions. This study analyzes and compares the social acceptance of different types of WWTP upgrades and capacity expansion projects. Contingent valuation method is used to elicit South Korean households’ willingness to pay (WTP) for preventing the expansion of a WWTP. The aggregated WTP is interpreted from the perspective of social conflict costs. The results show that the annual mean WTP of South Korean households to prevent WWTP expansion ranges from KRW 32,058 (US $27.61) to KRW 45,793 (US $39.44) depending on spatial location, which implies that the social conflict costs for the WWTP expansion in South Korea are considerable. It is also found that an underground WWTP at current site is a best alternative to lower the social conflict costs; it is even better than relocation an existing WWTP to another area. Several related policy implications are provided based on the analysis results.
AB - Securing a moderate level of social acceptance for obnoxious facilities, public facilities that have negative effects, such as odors, noise, or other disruptions, is critical to infrastructure plans. For wastewater treatment plant (WWTP), also obnoxious facilities, upgrading and expanding the capacity of existing WWTP, are more important than the construction of new plants, in some regions. This study analyzes and compares the social acceptance of different types of WWTP upgrades and capacity expansion projects. Contingent valuation method is used to elicit South Korean households’ willingness to pay (WTP) for preventing the expansion of a WWTP. The aggregated WTP is interpreted from the perspective of social conflict costs. The results show that the annual mean WTP of South Korean households to prevent WWTP expansion ranges from KRW 32,058 (US $27.61) to KRW 45,793 (US $39.44) depending on spatial location, which implies that the social conflict costs for the WWTP expansion in South Korea are considerable. It is also found that an underground WWTP at current site is a best alternative to lower the social conflict costs; it is even better than relocation an existing WWTP to another area. Several related policy implications are provided based on the analysis results.
KW - Contingent valuation method
KW - LULU
KW - NIMBY
KW - Sewage treatment plant
KW - Spatial distance
KW - Willingness to pay
UR - https://www.scopus.com/pages/publications/85089459780
U2 - 10.1007/s11356-020-10442-7
DO - 10.1007/s11356-020-10442-7
M3 - Article
C2 - 32803578
AN - SCOPUS:85089459780
SN - 0944-1344
VL - 27
SP - 45618
EP - 45628
JO - Environmental Science and Pollution Research
JF - Environmental Science and Pollution Research
IS - 36