Abstract
Due to the industrial development and population growth, it has recently been shown that there are many problems caused by the rinked treatment water in local goverments and sewage treatment plants. The rinked treatment water has a characteristic of low flow rate and high concentration unlike general sewage. These characteristics increase sewage treatment difficulty and sewage treatment fee of sewage treatment facilities. Among the many influencing factors that increase sewage treatment unit cost, 'linked treatment load/design inflow load (%)' was derived as the most correlated factor. Through the selection and modeling of sewage treatment plants, the excess scope of design discharge water quality was investigated under the conditions of temperature and the conditions of 'linked treatment load/design inflow load (%)' taking into account the effects of the four seasons. The study found that for TN, 'linked treatment load/design inflow load (%)' was 19.7%, 22.6%, 25.1%and 27.7%, respectively, under conditions of 5°C, 10°C, 20°C and 25°C. In case of TP, 'rinked treatment load/design inflow load (%)' was 10.7%, 12.2%, 15.6% and 17.5% at 5 ℃, 10 ℃, 20 ℃, and 25 ℃, respectively, under conditions of 5°C, 10°C, 20°C and 25°C.
Translated title of the contribution | Analysis of Proper Linked Treatment Load Using GPS-X Simulation |
---|---|
Original language | Korean |
Pages (from-to) | 244-250 |
Number of pages | 7 |
Journal | 한국습지학회지 |
Volume | 21 |
Issue number | 3 |
DOIs | |
State | Published - Aug 2019 |