Abstract
Participation in official development assistance (ODA) construction projects can be proposed as a way to revitalize Korean small and medium-sized construction companies' entry into the overseas construction market. To this end, the necessary competency items were derived for the execution of the project, and a survey was conducted and an analysis of importance-current competency was performed. 24 out of a total of 32 competency items were analyzed as having a low level of competency compared to their importance, indicating that it is urgent to strengthen corporate-level capabilities for the smooth execution of related projects in the future. In detail, it is judged that it is necessary to seek to establish a preferential capacity-strengthening plan for contract management-related items such as the 'Construction-related fundamental laws, Contract management method, and International administration negotiation'.
| Translated title of the contribution | Analyzing the ODA Construction Project Competence based on IPA |
|---|---|
| Original language | Korean |
| Pages (from-to) | 66-72 |
| Number of pages | 7 |
| Journal | 한국건설관리학회 논문집 |
| Volume | 22 |
| Issue number | 5 |
| DOIs | |
| State | Published - Sep 2021 |