Abstract

Purpose: The definition and factors of passive design being the sustainable method of building plan through the preceding research is deducted and the effect of passive design within the public library by applying the deducted factors in the case of built public libraries and further the realization plan of green library aimed to be reviewed in this research. Method: This study is to induce common elements of architecture plan for public library and passive design, and assess application level of re-classified elements of sustainable public library in order to analyze present condition of passive design applied on facilities of public library. First, related laws and planning standards of public library will be reviewed, then the definition of passive design will be considered using advanced research. Through advanced research related to planing elements and passive design for library induced from various plans for library standards, a common ground of induced passive design element will be transformed into assessment items and practices to be analyzed. Result: Libraries which are and are not preliminarily certified by G-SEED will be compared with each other in order to analyze the effects of passive design on G-SEED. Even though various passive elements such as load reduction of air conditioning and energy efficiency exist, there are no assessment tool within G-SEED. The fact that there are only standards for temporary methods such as utilization of construction material and installation of equipment highlights the challenges in quantitative evaluation.
Original languageEnglish
Pages (from-to)27-36
Number of pages10
JournalKIEAE Journal
Volume15
Issue number6
DOIs
StatePublished - Dec 2015

Fingerprint

Dive into the research topics of 'Passive Design Elements in the Architectural Planning of the Public Libraries - Focusing on the Comparison between Site and Building in the G-SEED Pre-certified and Non-certified library -'. Together they form a unique fingerprint.

Cite this