TY - JOUR
T1 - Prioritizing Energy Performance Improvement Factors for Senior Centers Based on Building Energy Simulation and Economic Feasibility
AU - Nam, Arisae
AU - Kim, Young Il
N1 - Publisher Copyright:
© 2024 by the authors.
PY - 2024/11
Y1 - 2024/11
N2 - This study examined energy performance improvement factors by analyzing both energy performance and the economic impacts to reduce energy costs for senior centers. A fact-finding survey was conducted on 20 senior centers in a metropolitan area, identifying key energy improvement factors. Energy simulations of the buildings were performed using ECO2, an officially certified energy assessment program in Korea, comparing the energy requirements before and after the improvements. The energy demand, energy consumption, and floor area were analyzed, with the J, K, and S standard models selected based on the median values of these factors. To assess the impact of the improvements, blower door tests were conducted on two senior centers before and after window upgrades. Based on the ECO2 simulations and the blower door test results, improvement priorities were identified in the following order: windows, exterior walls, boilers, roofs, and doors. Finally, an economic feasibility analysis applied the construction and heating costs to the standard models. Over a 40-year period, only boiler improvements generated a net profit. Without government support, this study recommends prioritizing boiler upgrades when selecting energy performance improvements.
AB - This study examined energy performance improvement factors by analyzing both energy performance and the economic impacts to reduce energy costs for senior centers. A fact-finding survey was conducted on 20 senior centers in a metropolitan area, identifying key energy improvement factors. Energy simulations of the buildings were performed using ECO2, an officially certified energy assessment program in Korea, comparing the energy requirements before and after the improvements. The energy demand, energy consumption, and floor area were analyzed, with the J, K, and S standard models selected based on the median values of these factors. To assess the impact of the improvements, blower door tests were conducted on two senior centers before and after window upgrades. Based on the ECO2 simulations and the blower door test results, improvement priorities were identified in the following order: windows, exterior walls, boilers, roofs, and doors. Finally, an economic feasibility analysis applied the construction and heating costs to the standard models. Over a 40-year period, only boiler improvements generated a net profit. Without government support, this study recommends prioritizing boiler upgrades when selecting energy performance improvements.
KW - blower door test
KW - building energy simulation
KW - life cycle cost
KW - primary energy
KW - senior center
UR - http://www.scopus.com/inward/record.url?scp=85210299437&partnerID=8YFLogxK
U2 - 10.3390/en17225576
DO - 10.3390/en17225576
M3 - Article
AN - SCOPUS:85210299437
SN - 1996-1073
VL - 17
JO - Energies
JF - Energies
IS - 22
M1 - 5576
ER -