Abstract
The constructed wetland was built as the vertical flow type wetland and the horizontal flow type wetland. The effluent collected from a nearby sewage treatment plant was operated for about 100 days. Through the results obtained while driving the constructed wetland, we tried to confirm the performance of removing low concentrations of BOD, TN, and TP in the effluent. Compared to the influent water, it was confirmed that BOD had 20%, TN had 90%, and TP had 100% of removal. It is judged that the pollution reduction efficiency sufficient to place the artificial wetland at the end of the sewage discharge treatment plant can be confirmed through the operation results. Throughout these result, it seemed that it may affect the removal rate to meet the total amount of water pollution.
| Translated title of the contribution | Evaluation of Pollution Reduction in Hybrid Constructed Wetlands on Test-Bed scale |
|---|---|
| Original language | Korean |
| Pages (from-to) | 338-343 |
| Number of pages | 6 |
| Journal | 한국습지학회지 |
| Volume | 26 |
| Issue number | 4 |
| DOIs | |
| State | Published - Nov 2024 |